MottMacDonald 2010 Coal CCS (FOAK) Coal Plant - IGCC with CCS 2010

Return to the cost.

Showing all changes since 2011-06-02 14:55:23 UTC

See all changes since this wiki was released

2011-06-02

Title: MottMacDonald 2010 Coal CCS (FOAK) Coal Plant - IGCC with CCS 2010 cost data point

Content: Please comment on:

# Whether and how the costs of carbon transport and storage have been dealt with
# What assumptions are made around the energy required to run the carbon capture

Categories:
Cost data points
Coal CCS cost data points



User: Michael Clark

Signed off by: 

Signed off at: 

Cost category: Coal CCS cost data

Cost source: MottMacDonald 2010 cost source

Valid for quantity of fuel: 

Valid in year: 2010

Efficiency: 33-36%

Life: 20-30 years

Size: 870MW

Fuel: 

Operating: £m(2009) 134-75.4 / 870MWpeak

Capital: £(2009) 3500-2894.7/KW

Default fuel unit: 

Default operating unit: 

Default capital unit: 

Label: (FOAK) Coal Plant - IGCC with CCS

Output: 83-88.7%
Title: MottMacDonald 2010 Coal CCS (FOAK) Coal Plant - IGCC with CCS 2010 cost data point

Content: Please comment on:

# Whether and how the costs of carbon transport and storage have been dealt with
# What assumptions are made around the energy required to run the carbon capture

Categories:
Cost data points
Coal CCS cost data points



User: Michael Clark

Signed off by: 

Signed off at: 

Cost category: Coal CCS cost data

Cost source: MottMacDonald 2010 cost source

Valid for quantity of fuel: 

Valid in year: 2010

Efficiency: 33-36%

Life: 20-30 years

Size: 870MW

Fuel: 

Operating: £m(2009) 134-75.4 / 870MWpeak

Capital: £(2009) 3500-2894.7/KW

Default fuel unit: 

Default operating unit: 

Default capital unit: 

Label: (FOAK) Coal Plant - IGCC with CCS