The UK 2050 Calculator Web Flash Excel Wiki
Register or sign in
This is a wiki Anyone can contribute, therefore we don't vouch for its accuracy.

E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + syngas fermentation in 2010 2010

Return to the cost.

Showing just the changes made in the edit by Richard Taylor at 2012-02-14 15:45:49 UTC

See all changes since this wiki was released

2012-07-30

2012-02-14


Title: E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + syngas fermentation in 2010 2010

Content: High capex and opex in 2010 due to scaling up to a "pioneer"/demonstration plant, from 2015 costs for first commercial plants

Source reference missing cost of microbes / biocatalyst operating costs



User: Richard Taylor

Signed off by: 

Signed off at: 

Cost category: Biomass conversion dry biomass and waste to liquid cost data

Cost source: E4tech (2012) BVCM cost source

Valid for quantity of fuel: 

Valid in year: 2010

Efficiency: 39%

Life: 20 years

Size: 150 MW

Fuel: 

Operating: £(2010) 5-10/MWh

Capital: £(2010) 4.84-8.99m/MW

Default fuel unit: 

Default operating unit: £(2010)/MWh

Default capital unit: £(2010)/MWh

Label: Gasif + syngas fermentation in 2010

Output: 85%