The UK 2050 Calculator Web Flash Excel Wiki
Register or sign in
This is a wiki Anyone can contribute, therefore we don't vouch for its accuracy.

35th centile between low and high end of "2050 working assumption" Interconnection Default 2010

Return to the cost.

Showing just the changes made in the edit by at 2011-11-15 11:42:42 UTC

See all changes since this wiki was released

2011-11-15

Title: 35th centile between low and high end of "2050 working assumption" Interconnection Default 2010

Content: No directly translatable MARKAL cost for this - have used 35th centile between Low and High cost



User: 

Signed off by: 

Signed off at: 

Cost category: Interconnection cost data

Cost source: 35th centile between low and high end of "2050 working assumption" cost source

Valid for quantity of fuel: 

Valid in year: 2010

Efficiency: 

Life: 

Size: 

Fuel: 

Operating: £m(2010)0.3 / GW

Capital: £m(2010)443.7 / GW

Default fuel unit: 

Default operating unit: £(2010)/KW

Default capital unit: £(2010)/KW

Label: Default

Output:
Title: 35th centile between low and high end of "2050 working assumption" Interconnection Default 2010

Content: Have used 35th centile between Low and High cost as MARKAL 3.26 "Interconnector NG" seemed much too low to be transferable.



User: 

Signed off by: 

Signed off at: 

Cost category: Interconnection cost data

Cost source: 35th centile between low and high end of "2050 working assumption" cost source

Valid for quantity of fuel: 

Valid in year: 2010

Efficiency: 

Life: 

Size: 

Fuel: 

Operating: £m(2010)0.3 / GW

Capital: £m(2010)443.7 / GW

Default fuel unit: 

Default operating unit: £(2010)/KW

Default capital unit: £(2010)/KW

Label: Default