The UK 2050 Calculator Web Flash Excel Wiki
Register or sign in
This is a wiki Anyone can contribute, therefore we don't vouch for its accuracy.

Redpoint Best Use of Biomass (2011) Biomass conversion gas to gas AD BTG - Landfill 3.0 MW 2011-2050

Return to the cost.

Showing just the changes made in the edit by Tom Counsell at 2011-08-04 15:27:43 UTC

See all changes since this wiki was released

2011-08-04


Title: Redpoint Best Use of Biomass (2011) Biomass conversion gas to gas AD BTG - Landfill 3.0 MW 2011-2050

Content: Underlying source given as SKM Enviros (2010) Analysis of characteristics and growth assumptions regarding AD biogas combustion for heat and biomethane projection and injection to the grid for DECC



User: Tom Counsell

Signed off by: 

Signed off at: 

Cost category: Biomass conversion gas to gas cost data

Cost source: Redpoint Best Use of Biomass (2011) cost source

Valid for quantity of fuel: 

Valid in year: 2011-2050

Efficiency: 91%

Life: 20 years

Size: 3MW

Fuel: 

Operating: £(2011)74.7/kW plus £(2011)3.8/MWh

Capital: £(2011)921/kW

Default fuel unit: 

Default operating unit: 

Default capital unit: 

Label: AD BTG - Landfill 3.0 MW

Output: 93%