Title: CEPA et al 2010 Electricity Transmission MEAV Content: Source gives a total Modern Equivalent Asset Value (MEAV) for the GB transmission grid, but not an operating cost. I have divided this total cost by 77 GW to match the way it would be used in the 2050 pathways calculator. I understand MEAV to mean the cost of replacing the whole grid tomorrow. This is higher than the regulated asset value, which appears to be based on historic cost. User: Tom Counsell Signed off by: Signed off at: Cost category: Electricity Transmission cost data Cost source: CEPA et al 2010 cost source Valid for quantity of fuel: Valid in year: Efficiency: Life: Size: Fuel: Operating: 0 Capital: £(2010)37bn/77GW Default fuel unit: Default operating unit: Default capital unit: Label: MEAV Output: |