Title: Markal 3.24 Nuclear Power Pebble Bed 2030 cost data point

Content: h2 Items that this cost includes

In particular, please explain how the following costs have been treated:

# Uranium extraction and processing
# Uranium storage
# Uranium disposal
# Connection costs to national grid

h2 Items that this cost excludes

h2 Detail on the conditions under which this cost is valid

h2 Explanations as to why this cost differs from others

h2 Limitations of this cost estimate

h2 Markal note

| Very high availabilities due to continous refuelling; | Cost based on M$1250/GW assumed 50% penalty to reflect uncertainty in development. Assumed nth kind of a plant (Kolb and Martinsen, 2003) |

Categories:
Cost data points
Nuclear Power cost data points



User: Tom Counsell

Signed off by: 

Signed off at: 

Cost category: Nuclear Power cost data

Cost source: Markal 3.24 cost source

Valid for quantity of fuel: 

Valid in year: 2030

Efficiency: 35%

Life: 50

Size: 1 GWpeak

Fuel: 

Operating: £(2000)0.39/GJ

Capital: £(2000)1786.5/kWpeak

Default fuel unit: 

Default operating unit: 

Default capital unit: 

Label: Pebble Bed

Output: 83%