Title: MottMacDonald (2011) Wave Floating Turbine 2010 cost data point Content: Assumed to be operating 25km offshore at a depth of 20m. Note: electrical grid connection is included in costs at roughly 16% of CAPEX in the hypothetical turbine, this increases post 2020 to reflect that more costly connection points will be used. Categories: Cost data points Wave cost data points User: Michael Clark Signed off by: Signed off at: Cost category: Wave cost data Cost source: MottMacDonald (2011) cost source Valid for quantity of fuel: Valid in year: 2010 Efficiency: Life: 18 years Size: 1MW Fuel: Operating: £(2010)130.9-74.3/KW Capital: £(2010)4848-3232/KW Default fuel unit: Default operating unit: Default capital unit: Label: Floating Turbine Output: 17.2% |