The UK 2050 Calculator Web Flash Excel Wiki
Register or sign in
This is a wiki Anyone can contribute, therefore we don't vouch for its accuracy.

E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + Mixed alcohols in 2020 2020

Return to the cost.

Showing just the changes made in the edit by Richard Taylor at 2012-07-30 12:30:07 UTC

See all changes since this wiki was released

2012-07-30

2012-02-14

Title: E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + Mixed alcohols in 2010 2010

Content: Not including higher alcohols

High capex and opex in 2010 due to scaling up to a "pioneer"/demonstration plant, from 2020 costs for first commercial plants



User: Richard Taylor

Signed off by: 

Signed off at: 

Cost category: Biomass conversion dry biomass and waste to liquid cost data

Cost source: E4tech (2012) BVCM cost source

Valid for quantity of fuel: 

Valid in year: 2010

Efficiency: 38%

Life: 20 years

Size: 150 MW

Fuel: 

Operating: £(2010) 26-48/MWh

Capital: £(2010) 3.06-5.68m/MW

Default fuel unit: 

Default operating unit: £(2010)/MWh

Default capital unit: £(2010)/MWh

Label: Gasif + Mixed alcohols in 2010

Output: 96%
Title: E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + Mixed alcohols in 2020 2020

Content: Not including higher alcohols

High capex and opex in 2010 due to scaling up to a "pioneer"/demonstration plant, from 2020 costs for first commercial plants



User: Richard Taylor

Signed off by: 

Signed off at: 

Cost category: Biomass conversion dry biomass and waste to liquid cost data

Cost source: E4tech (2012) BVCM cost source

Valid for quantity of fuel: 

Valid in year: 2020

Efficiency: 38%

Life: 30 years

Size: 150 MW

Fuel: 

Operating: £(2010) 0.11-0.16m/MW

Capital: £(2010) 1.99-2.75m/MW

Default fuel unit: 

Default operating unit: £(2010)/MWh

Default capital unit: £(2010)/MWh

Label: Gasif + Mixed alcohols in 2020

Output: 96%