Showing just the changes made in the edit by Richard Taylor at 2012-07-30 12:25:46 UTC
See all changes since this wiki was released
Title: E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + syngas fermentation in 2010 2010 Content: High capex and opex in 2010 due to scaling up to a "pioneer"/demonstration plant, from 2015 costs for first commercial plants Source reference missing cost of microbes / biocatalyst operating costs User: Richard Taylor Signed off by: Signed off at: Cost category: Biomass conversion dry biomass and waste to liquid cost data Cost source: E4tech (2012) BVCM cost source Valid for quantity of fuel: Valid in year: 2010 Efficiency: 39% Life: 20 years Size: 150 MW Fuel: Operating: £(2010) 5-10/MWh Capital: £(2010) 4.84-8.99m/MW Default fuel unit: Default operating unit: £(2010)/MWh Default capital unit: £(2010)/MWh Label: Gasif + syngas fermentation in 2010 Output: 85% |
Title: E4tech (2012) BVCM Biomass conversion dry biomass and waste to liquid Gasif + syngas fermentation in 2010 2010 Content: High capex and opex in 2010 due to scaling up to a "pioneer"/demonstration plant, from 2015 costs for first commercial plants Source reference missing cost of microbes / biocatalyst operating costs User: Richard Taylor Signed off by: Signed off at: Cost category: Biomass conversion dry biomass and waste to liquid cost data Cost source: E4tech (2012) BVCM cost source Valid for quantity of fuel: Valid in year: 2010 Efficiency: 39% Life: 30 years Size: 150 MW Fuel: Operating: £(2010) 0.025-0.031m/MW Capital: £(2010) 4.2-5.4m/MW Default fuel unit: Default operating unit: £(2010)/MWh Default capital unit: £(2010)/MWh Label: Gasif + syngas fermentation in 2010 Output: 85% |