Showing all changes since you last edited this page on 2011-10-24 17:23:57 UTC
See all changes since this wiki was released
Title: MARKAL 3.26 Tidal Stream Tidal Stream Technology - T2 2050 Content: h2 Items that this cost includes h2 Items that this cost excludes h2 Detail on the conditions under which this cost is valid h2 Explanations as to why this cost differs from others h2 Limitations of this cost estimate Categories: Cost data points Tidal Stream cost data points User: Signed off by: Signed off at: Cost category: Tidal Stream cost data Cost source: MARKAL 3.26 cost source Valid for quantity of fuel: Valid in year: 2050 Efficiency: Life: Size: Fuel: Operating: £(2000) 55/ kw Capital: £(2000) 615/ kw Default fuel unit: Default operating unit: £(2010)/kWpeak Default capital unit: £(2010)/kWpeak Label: Tidal Stream Technology - T2 Output: |
Title: MARKAL 3.26 Tidal Stream Tidal Stream Technology - T2 2050 Content: The out-lying nature of this cost was noticed shortly before going to press and is an issue which needs to be addressed. The problem arose due to the difficulty of mapping MARKAL 3.26 costs to the Calculator. The former operates a series of tranches with costs differing between them, while the calculator does not. Categories: Cost data points Tidal Stream cost data points User: Greg Haigh Signed off by: Signed off at: Cost category: Tidal Stream cost data Cost source: MARKAL 3.26 cost source Valid for quantity of fuel: Valid in year: 2050 Efficiency: Life: Size: Fuel: Operating: £(2000) 55/ kw Capital: £(2000) 615/ kw Default fuel unit: Default operating unit: £(2010)/kWpeak Default capital unit: £(2010)/kWpeak Label: Tidal Stream Technology - T2 Output: |