Showing just the changes made in the edit by Greg Haigh at 2012-07-25 10:29:43 UTC
See all changes since this wiki was released
Title: 35th centile between low and high end of "2050 working assumption" Wave 2050 Default 2050 Content: h2 Items that this cost includes h2 Items that this cost excludes h2 Detail on the conditions under which this cost is valid h2 Explanations as to why this cost differs from others h2 Limitations of this cost estimate Categories: Cost data points Wave cost data points User: Greg Haigh Signed off by: Signed off at: Cost category: Wave cost data Cost source: 35th centile between low and high end of "2050 working assumption" cost source Valid for quantity of fuel: Valid in year: 2050 Efficiency: Life: Size: Fuel: Operating: £m(2010)0.27/MWpeak Capital: £m(2010)3.6/MWpeak Default fuel unit: Default operating unit: £(2010)/kWpeak Default capital unit: £(2010)/kWpeak Label: 2050 Default Output: |