35th centile between low and high end of "2050 working assumption" Hydro pumped storage Default 2050

Return to the cost.

Showing all changes since you last edited this page on 2011-11-15 15:44:17 UTC

See all changes since this wiki was released

2012-07-06

2011-11-15

Title: 35th centile between low and high end of "2050 working assumption" Hydro pumped storage Default 2050

Content: MARKAL 3.26 operating cost was outside the "2050 working assumption" range. Capex was within the range. A default is currently being used.



User: 

Signed off by: 

Signed off at: 

Cost category: Hydro pumped storage cost data

Cost source: 35th centile between low and high end of "2050 working assumption" cost source

Valid for quantity of fuel: 

Valid in year: 2050

Efficiency: 

Life: 

Size: 

Fuel: 

Operating: £m(2010)12.8/GW

Capital: £m(2010)1776/GW

Default fuel unit: 

Default operating unit: £(2010)/KWpeak

Default capital unit: £(2010)/KWpeak

Label: Default

Output:
Title: 35th centile between low and high end of "2050 working assumption" Hydro pumped storage Default 2050

Content: MARKAL 3.26 operating cost was outside the "2050 working assumption" range. Capex was within the range. A default is currently being used.



User: Tom Bain

Signed off by: 

Signed off at: 

Cost category: Hydro pumped storage cost data

Cost source: 35th centile between low and high end of "2050 working assumption" cost source

Valid for quantity of fuel: 

Valid in year: 2050

Efficiency: 

Life: 

Size: 

Fuel: 

Operating: £m(2010)22.4/GW

Capital: £m(2010)2093/GW

Default fuel unit: 

Default operating unit: £(2010)/KWpeak

Default capital unit: £(2010)/KWpeak

Label: Default

Output: