Notes
Please comment on:
- Whether and how the costs of carbon transport and storage have been dealt with
- What assumptions are made around the energy required to run the carbon capture
Category | Coal CCS | |
Source | 2050 working assumption | |
Capital cost | £(2010)4154-468/KW | 468–4154£(2010)/kwpeak |
Operating cost | £(2010)163-38/KWpeak | 38–163£(2010)/kwpeak |
Year for which cost is valid | 2050 | 2050 |
Typical size | 1.2GW | |
Typical average output | 72.6-74.3% | |
Typical efficiency | 32-44% | |
Typical life | 35 years |
Please comment on: