Notes
Please comment on:
- Whether and how the costs of carbon transport and storage have been dealt with
- What assumptions are made around the energy required to run the carbon capture
Category | Coal CCS | |
Source | Markal 3.24 | |
Capital cost | £(2000)1235 - 1363/KW | 1600–1765£(2010)/kwpeak |
Operating cost | £(2000)29/KW plus £(2000)0.75/GJpeak | 68£(2010)/kwpeak |
Year for which cost is valid | 2015-2020 | 2015–2020 |
Typical average output | 83% | |
Typical efficiency | 34-41% | |
Typical life | 50 years |