Notes
Please comment on:
- Whether and how the costs of carbon transport and storage have been dealt with
- What assumptions are made around the energy required to run the carbon capture
Category | Coal CCS | |
Source | Markal 3.24 | |
Capital cost | £(2000)944 - 1210/KW | 1223–1567£(2010)/kwpeak |
Operating cost | £(2000)26/KW plus £(2000)0.72/GJpeak | 63£(2010)/kwpeak |
Year for which cost is valid | 2010-2030 | 2010–2030 |
Typical average output | 90% | |
Typical efficiency | 37-40% | |
Typical life | 35 years |