Category | Solid Fuel CHP | |
Source | 2050 working assumption | |
Capital cost | £(2010)34,000-21,620/20KW | 123–194£m(2010)/TWh |
Operating cost | £(2010)1900-560/20KW | 3–11£m(2010)/TWh |
Year for which cost is valid | 2010-2050 | 2010–2050 |
Typical average output | 100% | |
Typical life | 15 years |