Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1750-1008/KW | 1008–1750£(2010)/KWpeak |
Operating cost | £(2010)143-85/KW | 85–143£(2010)/KWpeak |
Year for which cost is valid | 2030 | 2030 |
Typical size | <100MW | |
Typical average output | 40% | |
Typical life | 25 years |