Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1813-1045/KW | 1045–1813£(2010)/KWpeak |
Operating cost | £(2010)145-87/KW | 87–145£(2010)/KWpeak |
Year for which cost is valid | 2025 | 2025 |
Typical size | <100MW | |
Typical average output | 40% | |
Typical life | 25 years |