Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1910-1101/KW | 1101–1910£(2010)/KWpeak |
Operating cost | £(2010)149-89/KW | 89–149£(2010)/KWpeak |
Year for which cost is valid | 2020 | 2020 |
Typical size | <100MW | |
Typical average output | 40% | |
Typical life | 25 years |