Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)2121-1222/KW | 1222–2121£(2010)/KWpeak |
Operating cost | £(2010)156-93/KW | 93–156£(2010)/KWpeak |
Year for which cost is valid | 2015 | 2015 |
Typical size | <100MW | |
Typical average output | 40% | |
Typical life | 25 years |