Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)2506-1444/KW | 1444–2506£(2010)/KWpeak |
Operating cost | £(2010)166.8-99.6/KW | 100–167£(2010)/KWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | <100MW | |
Typical average output | 40% | |
Typical life | 25 years |