Category | Hydro pumped storage | |
Source | Parsons Brinckerhoff | |
Capital cost | £(2010)1131.67096590909-5078.7425/kwpeak | 1132–5079£(2010)/KWpeak |
Operating cost | £m(2010)7.9-19.3/400MW | 20–48£(2010)/KWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | 400MW | |
Typical average output | 100% |