Category | Coal CCS | |
Source | Parsons Brinckerhoff | |
Capital cost | £(2010)2206-1939/Kwpeak | 1939–2206£(2010)/kwpeak |
Operating cost | £m(2010)151-286/2.24GW | 67–128£(2010)/kwpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | 1600MW | |
Typical average output | 100% |