Notes
Items that this cost includes
- How does it treat the energy requirement for the CCS (e.g., is the capacity net or gross of this figure)
Items that this cost excludes
- How does it treat CO2 transportation and storage?
Category | Gas CCS Electricity Generation | |
Source | MottMacDonald (2011) | |
Capital cost | £(2010)988.5-468.16/KW | 468–989£(2010)/kWpeak |
Operating cost | £(2010)26.7-10.77/KW plus £(2010)2.8-4.1/MWh | 33–59£(2010)/kWpeak |
Year for which cost is valid | 2050 | 2050 |
Typical average output | 91% | |
Typical efficiency | 49% | |
Typical life | 30 years |