Category | Geosequestration | |
Source | IMechE (2011) | |
Capital cost | £bn(2010) 3/1600 MW | 1875£(2010)/kW |
Operating cost | €bn(1990)10-30/MWh | 105344567994–316033703983£(2010)/kW |
Year for which cost is valid | 2050 | 2050 |
Typical size | 1600 MW | |
Typical average output | 80% | |
Typical efficiency | 50% | |
Typical life | 30 |