Category | Gas CCS Electricity Generation | |
Source | Markal 3.24 | |
Capital cost | 463 - 690 £(2000)/kWpeak | 600–894£(2010)/kWpeak |
Operating cost | 12.08 £(2000)/kWpeak plus 0.47 £(2000)/GJ | 32£(2010)/kWpeak |
Year for which cost is valid | 2010 - 2040 | 2010–2040 |
Typical average output | 83% | |
Typical efficiency | 47 - 60% | |
Typical life | 35 |