Notes
4GW Maximum upper bound
Category | Interconnection | |
Source | Markal 3.24 | |
Capital cost | £m(2000)150/GW | 194£(2010)/KW |
Operating cost | £m(2000)0.3/GW | 0£(2010)/KW |
Year for which cost is valid | 2000-2050 | 2000–2050 |
Typical average output | 50% |
4GW Maximum upper bound