Category | Geothermal Electricity | |
Source | 2050 working assumption | |
Capital cost | £(2010)7848-4016/kw | 4016–7848£(2010)/kWpeak |
Operating cost | £(2010)85-258/kwpeak | 85–258£(2010)/kWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | 10MW | |
Typical average output | 80% | |
Typical life | 25 years |