Category | Tidal Range | |
Source | 2050 working assumption | |
Capital cost | £(2010)4157-2475/KW | 2475–4157£(2010)/kWpeak |
Operating cost | £(2010)13-42/KWpeak | 13–42£(2010)/kWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | 240MW | |
Typical average output | 22.8-19% | |
Typical life | 45 years |