Category | Hydroelectricity | |
Source | MottMacDonald 2010 | |
Capital cost | £(2009)1667-1989/kw | 1716–2047£(2010)/kWpeak |
Operating cost | £(2009)12.24-17.28/kwpeak | 13–18£(2010)/kWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | 100MW | |
Typical life | 45-55 years |