Notes
Enviros 2005, page 47. O&M assumed to be 10% of CAPEX
Category | Hydroelectricity | |
Source | Markal 3.24 | |
Capital cost | £(2000)800/KW | 1036£(2010)/kWpeak |
Operating cost | £(2000)80/kwpeak | 104£(2010)/kWpeak |
Year for which cost is valid | 2000 | 2000 |
Typical average output | 37% | |
Typical life | 40 years |
Enviros 2005, page 47. O&M assumed to be 10% of CAPEX