Category | Biomass conversion 1st generation energy crops to liquid | |
Source | E4tech (2012) BVCM | |
Capital cost | £(2010) 0.077m/MW | 9£(2010)/MWh |
Operating cost | £(2010) 2.7/MWh | 3£(2010)/MWh |
Year for which cost is valid | 2010 | 2010 |
Typical size | 75 MW | |
Typical average output | 95% | |
Typical life | 30 years |