Category | Biomass conversion dry biomass and waste to liquid | |
Source | E4tech (2012) BVCM | |
Capital cost | £(2010) 0.95-1.37m/MW | 113–163£(2010)/MWh |
Operating cost | £(2010) 0.184-0.356m/MW | 22–42£(2010)/MWh |
Year for which cost is valid | 2020 | 2020 |
Typical size | 150 MW | |
Typical average output | 96% | |
Typical efficiency | 34% | |
Typical life | 30 years |