Category | Biomass conversion dry biomass and waste to liquid | |
Source | E4tech (2012) BVCM | |
Capital cost | £(2010) 2.7-3.4m/MW | 321–404£(2010)/MWh |
Operating cost | £(2010) 0.15-0.19m/MW | 18–23£(2010)/MWh |
Year for which cost is valid | 2010 | 2010 |
Typical size | 150 MW | |
Typical average output | 96% | |
Typical efficiency | 40% | |
Typical life | 30 years |