Category | Biomass conversion 2nd generation energy crops to liquid | |
Source | E4tech (2012) BVCM | |
Capital cost | £(2010) 0.71-1.47m/MW | 89–184£(2010)/MWh |
Operating cost | £(2010) 0.025-0.17m/MW | 3–21£(2010)/MWh |
Year for which cost is valid | 2050 | 2050 |
Typical size | 150 MW | |
Typical average output | 91% | |
Typical efficiency | 59% | |
Typical life | 30 years |