Category | Biomass conversion dry biomass, biocrops and waste to solid | |
Source | E4tech (2012) BVCM | |
Capital cost | £(2010) 18176/MWpeak | 2£(2010)/MWh |
Operating cost | £(2010) 1.04/MWh | 1£(2010)/MWh |
Year for which cost is valid | 2010-2050 | 2010–2050 |
Typical size | 56.25 MW | |
Typical average output | 95% | |
Typical life | 20 years |