Category | Biomass conversion dry biomass, biocrops and waste to solid | |
Source | E4tech (2012) BVCM | |
Capital cost | £(2010) 6064/MWpeak | 3£(2010)/MWh |
Operating cost | £(2010) 0.41/MWh | 0£(2010)/MWh |
Year for which cost is valid | 2010-2050 | 2010–2050 |
Typical size | 22.5 MW | |
Typical average output | 21% | |
Typical life | 10 years |