Notes
MARKAL 3.26 operating cost was outside the "2050 working assumption" range. Capex was within the range. A default is currently being used.
Category | Hydro pumped storage | |
Source | 35th centile between low and high end of "2050 working assumption" | |
Capital cost | £m(2010)2093/GW | 2093£(2010)/KWpeak |
Operating cost | £m(2010)22.4/GW | 22£(2010)/KWpeak |
Year for which cost is valid | 2050 | 2050 |
MARKAL 3.26 operating cost was outside the "2050 working assumption" range. Capex was within the range. A default is currently being used.