Notes
Preparing for use for energy.
No MARKAL cost for this - have used 35th centile between Low and High ends of cost range.
Category | Waste collection and separation | |
Source | 35th centile between low and high end of "2050 working assumption" | |
Capital cost | £(2010) 19/tonne | 19£(2010)/tonne |
Operating cost | £(2010) 19/tonne | 19£(2010)/tonne |
Year for which cost is valid | 2010 | 2010 |
Preparing for use for energy.
No MARKAL cost for this - have used 35th centile between Low and High ends of cost range.