Category | Conventional Coal Electricity Generation | |
Source | Markal 3.24 | |
Capital cost | £(2000) 791 - 870/kWpeak | 1025–1127£(2010)/KWpeak |
Operating cost | £(2000) 17/kWpeak plus £(2000) 0.31/GJ | 33£(2010)/KWpeak |
Year for which cost is valid | 2010-2030 | 2010–2030 |
Typical average output | 90% | |
Typical efficiency | 43-52% | |
Typical life | 50 |