Notes
Please comment on:
- Whether and how the costs of carbon transport and storage have been dealt with
- What assumptions are made around the energy required to run the carbon capture
Category | Coal CCS | |
Source | MARKAL 3.26 | |
Capital cost | £(2000) 1633/ kw | 2115£(2010)/kwpeak |
Operating cost | £(2000) 40.943/ kw | 53£(2010)/kwpeak |
Year for which cost is valid | 2010 | 2010 |
Please comment on: