Notes
Take widest range of cost estimates.
Category | Electricity Distribution | |
Source | 2050 working assumption | |
Capital cost | £m(2010)106-1688/GW | 106–1688£m(2010)/GW |
Operating cost | £m(2010)3/GW | 3£m(2010)/GW |
Take widest range of cost estimates.