Category | Hydroelectricity | |
Source | Arup/EY | |
Capital cost | £(2010)2797-9507/Kwpeak | 2797–9507£(2010)/kWpeak |
Operating cost | £(2010)115-21/Kwpeak | 21–115£(2010)/kWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | Mainly <5MW | |
Typical average output | 35.7-36.7% | |
Typical efficiency | 100% | |
Typical life | 60-100 years |