Category | Solid Biomass Electricity Generation | |
Source | Arup/EY | |
Capital cost | £(2010)40-167/Kwpeak | 40–167£(2010)/kw |
Operating cost | £(2010)19.9999999999817-30/Kwpeak | 20–30£(2010)/kw |
Year for which cost is valid | 2010 | 2010 |
Typical average output | 51% |