Category | Geothermal Electricity | |
Source | Arup/EY | |
Capital cost | £(2010)1852-5304/Kwpeak | 1852–5304£(2010)/kWpeak |
Operating cost | £(2010)144-258/Kwpeak | 144–258£(2010)/kWpeak |
Year for which cost is valid | 2030 | 2030 |
Typical size | 3.5-10MW | |
Typical average output | 90% | |
Typical life | 25 years |