Category | Geothermal Electricity | |
Source | Arup/EY | |
Capital cost | £(2010)1998-5723/Kwpeak | 1998–5723£(2010)/kWpeak |
Operating cost | £(2010)142-256/Kwpeak | 142–256£(2010)/kWpeak |
Year for which cost is valid | 2015 | 2015 |
Typical size | 3.5-10MW | |
Typical average output | 90% | |
Typical life | 25 years |