Category | Geothermal Electricity | |
Source | Arup/EY | |
Capital cost | £(2010)2681-7680/Kwpeak | 2681–7680£(2010)/kWpeak |
Operating cost | £(2010)142-255/Kwpeak | 142–255£(2010)/kWpeak |
Year for which cost is valid | 2010 | 2010 |
Typical size | 3.5-10MW | |
Typical average output | 90% | |
Typical life | 25 years |