Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1336-2447/Kwpeak | 1336–2447£(2010)/KWpeak |
Operating cost | £(2010)61-158/Kwpeak | 61–158£(2010)/KWpeak |
Year for which cost is valid | 2030 | 2030 |
Typical size | >50MW | |
Typical average output | 40% | |
Typical life | 25 years |