Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)1500-2616/Kwpeak | 1500–2616£(2010)/KWpeak |
Operating cost | £(2010)69-169/Kwpeak | 69–169£(2010)/KWpeak |
Year for which cost is valid | 2025 | 2025 |
Typical size | >50MW | |
Typical average output | 40% | |
Typical life | 25 years |