Category | Offshore Wind | |
Source | Arup/EY | |
Capital cost | £(2010)2265-3317/Kwpeak | 2265–3317£(2010)/KWpeak |
Operating cost | £(2010)105-211/Kwpeak | 105–211£(2010)/KWpeak |
Year for which cost is valid | 2015 | 2015 |
Typical size | >50MW | |
Typical average output | 40% | |
Typical life | 25 years |